Where can I mount the operator touch screen?

In the vast majority of installations, the installer mounts the touchscreen the same location as the original operator panel. This allows the two temperature sensor plugs and the yellow (+) and brown (-) wires to be plugged into the touchscreen.

If you’re mounting to a regular luan wall,  consider using the optional wall mount plate to add strength and security for the touchscreen installation.

If you’re mounting to a large black control panel surface, you may benefit from mounting the touchscreen upside down, See this article.

Note that if you wish to have a touchscreen at another location,  a REMOTE DISPLAY is available.

Category: WAITER ECC - INSTALL